Thermal Imaging Remedial Works for Boyds Asparagus

Thermal Imaging Remedial Works

Project Requirements

Boyds Asparagus, a leading agricultural enterprise, approached Peebles Electrical seeking assistance with their thermal imaging findings. The client had recently conducted a comprehensive thermal assessment of their facilities and identified several issues that required urgent attention.

Boyds Asparagus provided Peebles Electrical with the thermal imaging report, highlighting areas of concern. Their request was clear: assess the issues, provide a detailed quote for remedial works, and ensure compliance with safety standards.

Thermal Imaging

Planning

Site Visit and Assessment: Peebles Electrical dispatched an experienced estimator to Boyds Asparagus. The site visit allowed us to understand the scope of work and prioritize areas for remediation.

Breakdown of Work: We meticulously categorized the issues based on severity and location. Each area received individual attention to ensure a comprehensive solution.

Control Board Upgrade
Thermal Imaging of electrical board

Implementation

Control Board Replacement

The most critical upgrade involved replacing the control board for the Water Pump Distribution Board. Here’s what we did:

  1. Complete Replacement: The existing control board was outdated and malfunctioning. We installed a brand-new control board with state-of-the-art features.
  2. Exterior Controls: To enhance accessibility, we positioned the controls on the exterior of the box. This streamlined maintenance and troubleshooting.
  3. Enhanced Circuit Protection: Safety was paramount. We integrated robust circuit protection mechanisms to prevent electrical faults.
    Other Remedial Works

While the control board replacement was the major focus, we addressed other issues as well:

  • Wiring Corrections: We rectified wiring inconsistencies and ensured proper connections.
  • Lighting Upgrades: Energy-efficient LED lighting fixtures replaced outdated bulbs.
  • Compliance Measures: Some tasks were time-consuming due to compliance requirements. We meticulously followed regulations to guarantee safety and adherence.

Outcomes

Peebles Electrical successfully completed all remedial works. Boyds Asparagus now benefits from:

  • Improved Efficiency: The upgraded control board ensures smooth water pump operation.
  • Enhanced Safety: Circuit protection measures mitigate risks.
  • Long-Term Partnership: Our commitment to quality work has fostered an ongoing relationship with Boyds Asparagus.

Conclusion

The Thermal Imaging Remedial Works project exemplifies Peebles Electrical’s dedication to excellence. By addressing critical issues promptly, we’ve not only improved infrastructure but also forged lasting partnerships with our clients. Boyds Asparagus continues to trust us with their electrical needs, and we look forward to supporting their growth.